KOA provided complete design and engineering services (PS&E). We also coordinated/obtained approval from Ventura County Watershed District and US Army Corp of Engineers to provide connectivity and to existing bike paths/routes in the area and conform to the visions and details described in the Arroyo Simi Greenway Specific Plan. The project included a 130-foot long, 12-foot wide pre-fabricated streel bridge spanning over the Arroyo Simi Channel. This required extremely close coordination with the design team and contractors to install the bridge above the FIMA base flood elevation.