Beech Avenue Improvement Project

KOA prepared plans and cost estimates for the design of Beech Ave. The project included new road construction plans for connecting Beech Ave. from Foothill Blvd. and just north of the Pacific Electric Trail.  Traffic signals and interconnection are proposed along Beech Ave. at Foothill Blvd., the Pacific Electric Trail, and at Miller Ave. These plans proposed construction of ADA access ramps, bus bay, road widening, storm drain, signing and striping, fiber optic interconnection, and the installation of traffic signals.