The City of Azusa hired KOA to provide traffic signal design, centralized traffic control system and monitoring upgrade, construction management and inspection services for their ATMS . The project budget is approximately $6.7 million to provide traffic improvements at total of forty-two (42) project intersections that include installation of intersection signal equipment, detection systems, a centralized traffic control and monitoring system, signal timing, improved street configurations at Foothill Boulevard and Alosta Avenue, and upgraded curb ramps at project intersections. The project will also replace antiquated controllers and cabinets, install network switches and routers enabling communication between local field elements and the Traffic Management Center (TMC). The design will provide a new TMC work station, as well as connection to the County IEN network in the future.