KOA provided construction management and inspection services for the Ramona Blvd. and Valley Blvd. Intersection Improvement Project. The work included reducing the intersection from a 5 leg to traditional 4 leg intersection: ADA curb ramp installation, new sidewalk, curb and gutter, driveways repairs, new irrigation and landscaping, construction of stormwater retention bio basins, medians, signal timing, pavement mill and overlay, installation of signing, striping and markings.