KOA performed construction management and inspection for the construction of a brand new 12,500 sf fire station, 5,200 sf emergency resource center and 125 foot wireless communications tower. This project located on a 1.2 acre lot and included demolition of an existing structure and parking lots, as well as traffic signal mitigation and utility rerouting. The structure is a combination of structural steel and wood construction and includes an IT room. The complete outside of the building has a Palos Verdes stone veneer, which used local hand trimmed stone attached to the shear walls. This whale watching and interpretive center located above the sea cliffs at Point Vicente on the Palos Verdes Peninsula is is an important vantage point for whale watching as over 2000 Pacific gray whales pass close to this point during the whale migration season. This was a LEED Certified Project.