KOA assisted the City of Big Bear Lake in the redevelopment of a commercial corridor connecting the mountain to the lake by designing a 2200-foot-long complete street on Moonridge Road. The project includes street light design, design of a dedicated Class I Bikeway, signature roundabouts on each end of the corridor, on-street parking, enhanced bus stops, wide sidewalks, 26 ADA ramps, parkway landscaping and a center landscaped median, and two travel lanes in each direction. One of the signature roundabouts is oval shaped and the other is dog bone shaped. Construction on the $8.6 million project was recently completed.