KOA provided project management services for 4 pre-engineered beach restroom facilities. The close proximity of the tidal water to the buildings created ground water problems for the laying of the sewer lines and the construction of the underground components of the building. The scope of KOA’s contract included plan check approval of the pre-engineered drawings, preparation of the scope of work and bid document for the demolition and site clearance, and preparation of plans detailing utility  relocations/alterations. KOA provided Bid phase project management and construction management of the demolition and site clearance, and installation of the pre-engineered restrooms.