KOA provided safe routes to school planning and engineering services for three schools in the City of Burbank. The project consisted of conducting walk and bicycle audits of the street conditions around the three schools as well as conducting travel surveys. In addition to the school outreach, KOA staff has conducted general community outreach, which together with the school related activities, were used to develop an alternatives analysis to assess the most appropriate infrastructure countermeasures to address safety deficiencies in the school vicinity. KOA prepared plans, specifications, and cost estimates for the design of safety elements at each school including high visibility crosswalks at 18 intersections), advanced warning school signage and pavement markings, 32 curb ramps, and curb extensions at the intersections of Winona Avenue/Lincoln Street and 6th Street/Cambridge Drive.