The scope of work consisted of the grinding and removal of existing pavement, concrete and asphalt paving, pavement slurry seal, removal and reconstruction of sections of the street, construction of curb and gutter, sidewalks, driveways, ADA ramps, irrigation and landscaping of existing medians, striping and adjustment of utilities and other work. In addition to the above the project involved the removal and replacement of 50,500 SF of residential sidewalks, and the removal and replacement of cross gutters at 9
intersections.