For this early childhood through eighth grade private school located on Olympic Boulevard in the City of Beverly Hills, we initially were retained to review student drop-off/pick-up procedures. Based on the results of a multiple-day queuing survey, we provided recommendations to enhance student loading/unloading operations. Subsequently, KOA coordinated with City staff to develop the methodology for analyzing the transportation, parking, and circulation impacts associated with the rehabilitation and expansion of the school and prepared the required analyses. We also reviewed and refined proposed site parking layouts, pedestrian paths, and driveway configurations. Due to site changes, we ultimately assisted with the redesign of the student drop-off/pick-up area along Doheny Drive. We also prepared the school rehabilitation and expansion project loading analysis.